Projects - Design of Central Utility Building for Influenza Vaccine Manufacturing Factory (Saraburi)

Project Description

605112_UtilityBGPO

 

LOCATION
Kaeng Khoi district, Saraburi Province

OWNER
The Government Pharmaceutical Organization (GPO)

DESCRIPTION
The project is for design of the central utility building, is 2-storey reinforce concrete building with the total usable area of 2,417 sq.m. and central utility system consists of cooling system, boiler system, purified water system, air compression system, and fire protection system etc. for support influenza vaccine manufacturing. The project located on 80 rais (13 hectares). It plans to manufacture Influenza Vaccine 2 million dozes in 2011 from the beginning, and during flu season will expand the capacity to manufacture 10 million dozes. It plans to manufacture Influenza Vaccine follow by Good Manufacturing Practices (GMP) of World Health Organization (WHO).

CONSTRUCTION COST
100 million Baht (3.1 million USD) (1 USD : 32 Baht)

SERVICE RENDERED
–  Architectural design;
–  Overall engineering design (structural, mechanical, electrical, and sanitary).

DURATION
May – July 2008