LOCATION: Map Ta Phut, Rayong province
OWNER: Thai Petrochemical Industries (TPI)
DESCRIPTION: TPI submarine pipeline project is proposed to be the unloading facility of crude oil. The submarine piping has a diameter of 18”, length 9,500 m. length and linked with four storage tanks, each with a capacity of 50,000 litre.
SERVICE RENDERED: Carry out the conceptual design and cost estimation of the pipeline and other equipment in the system.
CONSTRUCTION COST: 150 million baht
DURATION: 1992
- Home
- About Us
- Projects
- Architectural Study / Design and Related Activities
- Civil / Structural Engineering
- Construction Supervision / Management
- Economics and Development Planning
- Environmental Study / Engineering
- Industrial Enterprise Development
- International Projects / International Funds
- Management Information System (MIS) / Geographic Information System (GIS)
- Mechanical / Electrical Engineering / Energy Conservation
- Power / Petrochemical Engineering
- Special Projects / Research and Development
- Survey Engineering
- Transportation / Infrastructural Engineering
- Urban / Regional Planning
- Water Resources Study / Engineering
- COT Academy
- News
- Publication
- Job Vacancies
- Contact