LOCATION
Trang, Phatthalung, Satun, Songkhla, Pattani, Yala, and Narathiwat provinces
OWNER
Office of Accelerated Rural Development (ARD), Ministry of Interior
DESCRIPTION
The project is survey and detailed design for renovation and construction of 2-lane rural roads, Group IX, under Hat Yai ARD center. The project comprises of 61 routes in different provinces, a total length of 435.5 km. including reinforced concrete bridges, a total length of 197 m.
CONSTRUCTION COST
1,500 million Baht (60 million USD) (1 USD : 25 Baht)
SERVICE RENDERED
– Topographic survey and mapping;
– Detailed engineering design;
– Cost estimation.
DURATION
September 1996 – July 1997