LOCATION
Mae Moh district, Lampang province
OWNER
Teda Co., Ltd.
DESCRIPTION
The consultant is required to carry out preliminary design of canal crossing bridge connected to entrance road of substation and drainage pipes of the road to Mae Moh mine substation project with the following requirement:
– Steel or reinforced concrete bridge having 8 m. width and 35 m. length;
– Drainage pipes and manholes along the road with 1.5 m. diameter reinforced concrete pipes.
SERVICE RENDERED
– Topographic survey and mapping.
– Preliminary detailed design of bridge and drainage pipes.
– Preliminary specifications and cost estimates.
DURATION
May – June 2008