LOCATION
The Rama IX bridge to chaloem Maha nakorn Expressway
OWNER
Metropolitan Electricity Authority (MEA)
DESCRIPTION
Supervising the replacement of power line system to underground power line system in the Rama III project from Rama VI bridge to a frontage of chalerm Mahanakorn expressway. The total length along Rama III road is 6.2 km covered the project area from the edge of right of way (edge of road curb) to 50 meters offset on the side. The project includes electric engineering work ,civil engineering and structural work, architectural work ,and related works
SERVICE RENDERED
Construction Supervision
DURATION
May 2017 – November 2020