LOCATION
Uthaithani province
OWNER
Department of Public Works and Town & Country Planning, Ministry of Interior
DESCRIPTION
The project is for master planning, feasibility study, and detailed design of flood protection and drainage system for the municipal and adjacent areas of Uthaithani province covering an area of 6,730 sq.km.
CONSTRUCTION COST
997 million Baht (30.2 million USD) (1 USD : 33 Baht)
SERVICE RENDERED
– Master planning of flood protection and drainage system for 13 municipalities;
– Feasibility study of flood protection and drainage system for 3 crisis municipalities;
– Detailed design of flood protection and drainage system for 2 municipalities.
DURATION
June 2008 – March 2010