LOCATION
Krabi province
OWNER
Provincial Waterworks Authority
DESCRIPTION
The project is the study on master planning and feasibility study for the investment of the water supply system extension in the area of Krabi province for the purpose of adequate water supply service in the next 10 and 20 years. The total project area is 4,709 sq.km. including 3 water supply branches;
• Krabi branch with a total capacity of 1,150 cu.m. per hour;
• Khlong Thom branch with a total capacity of 250 cu.m. per hour;
• Ao Luek branch with a total capacity of 150 cu.m. per hour.
CONSTRUCTION COST
1,315 million Baht (37.6 million USD) (1 USD : 35 Baht)
SERVICE RENDERED
– Study and prepare project investment master plan of water demand in the next 10 and 20 years, from 2010;
– Feasibility study on project investment in the next 10 years, from 2010;
– Study and analysis of management method of each water supply branch of Krabi province.
DURATION
May 2009 – June 2010