Projects - IEE for the Design and Construction Terminal Station and Substation (Bangkok, Nonthaburi, Samut Prakan )

Project Description

LOCATION : Bangkok, Nonthaburi, and Samut Prakan Provinces

OWNER : Energy and Environmental Research Institute, Chulalongkorn University

DESCRIPTION : Study initial environmental examination (IEE) and forecast environmental impact occurred from construction and operation activities of substations. The project consists of 8 terminal stations and substations for preparing preventive environmental impact measures and setting up as standard code of practice for Metropolitan Electricity Authority’s overall operation.

SERVICE RENDERED :
– Initial environmental evaluation (IEE).
– Measure and evaluate environmental quality.
– Survey community opinion around substation.
– Prepare environmental manual.

DURATION :  August 2007 – October 2008