Projects - Feasibility Study, Survey and Design for Lower Loei Basin Development (Loei)

Project Description

324403_LoeiR

 

LOCATION
Loei province

OWNER
Department of Accelerated Rural Development, Minirty of Interior

DESCRIPTION
The project is for study of Lower Loei Basin development for the water potential of 5 weirs and 6 reservoirs tributaries of Loei River. The project includes the design of 2 weirs on Loei River basin which are;
•  Ei Keng weir for irrigation area of 17,500 rais (2,800 hectares);
•  Ban Nong Phum weir for 12,500 rais (2,000 hectares).

CONSTRUCTION COST
290 million Baht (6.4 million USD) (1 USD : 45 Baht)

SERVICE RENDERED
–  Survey and potential study for the basin development;
–  Feasibility study;
–  Environmental impact assessment;
–  Detailed engineering design;
–  Cost estimation.

DURATION
June 2001 – March 2002