LOCATION
Nakhon Phanom and Sakon Nakhon provinces
OWNER
Royal Irrigation Department, Ministry of Agriculture and Cooperatives
DESCRIPTION
The project is for study on water resources development of Nam Kam and Nam Bang Basins covering the irrigation area of 73,200 rais (11,712 hectares). The project includes large marsh dragging, control building construction, Nam Kam and Nam Bang Rivers development, water control gate construction, and water distribution system work.
CONSTRUCTION COST
1,862 million Baht (74.5 million USD) (1 USD : 25 Baht)
SERVICE RENDERED
– Survey and potential study of basin development.
– Feasibility study;
– Environmental impact assessment;
– Detailed engineering design.
DURATION
March 1994 – August 1996