LOCATION
Mueang district, Samut Sakhon province
OWNER
Samut Sakhon Municipality Office
DESCRIPTION
The project is for evaluation and revision of Samut Sakhon comprehensive plan in 4 main aspects including population, land use, transportation, and factors effecting community change. The project includes 3 components;
• Comprehensive plan evaluation: covering existing comprehensive plan area of 160 sq.km.;
• Comprehensive plan revision: covering existing area and expanded area to serve future expansion of the community,
a total area of 460 sq.km.;
• Preparation of infrastructure master plan: covering area of 460 sq.km.
SERVICE RENDERED
– Comprehensive plan evaluation: evaluate comprehensive plan, survey and collect stakeholders attitude and comments,
and conclude the evaluation results and recommend the revision of comprehensive plan;
– Comprehensive plan revision: identify criterias and analyze data for comprehensive plan revision, and prepare
comprehensive plan;
– Preparation of infrastructure master plan: identify design criterias and conceptual design of infrastructure system,
prepare master plan of infrastructures in comprehensive area, and pre-estimate construction cost and development
period.
DURATION
September 2011 – March 2014