LOCATION
Mae Sot district, Tak province
OWNER
Infra Technology Services Co., Ltd.
DESCRIPTION
The sanitary system design for Mae Sot clean energy project, total area approximately of 300 rais (48 ha.), consists of waste water treatment and collecting pipeline system. The waste water treatment system includes a stabilized puddle and a 200,000 cu.m. waste water pond which can store treated water at least 75 days. The waste water collection system started from buildings to pumping station by gravity flow and transfer to waste water treatment plant by HDPE pipe (Pressure pipe). The waste water quantity get into waste water treatment system is 2,500 cu.m. per day.
CONSTRUCTION COST
80 Million Baht (Sanitary System) (2.5 Million USD) (1 USD : 32 Baht)
SERVICE RENDERED
– Waste water treatment system detailed design;
– Waste water collecting and piping system detailed design.
DURATION
May – June 2008