Project Description

103705_3SubStation

LOCATION
Bangkok and Samut Prakan province

OWNER
Metropolitan Electricity Authority

DESCRIPTION
The 3 electricity transmission stations is 5-storey reinforce concrete building with a terminal and 2 sub-stations consists of battery room, 24 kV. switchgear room, GIS lab, cable & cable routes room, control room, and transformer cell. The total area stations of;

  • Chaengwattana terminal station: a total area of 4,000 sq.m.;
  • Bering sub-station: a total area of 2,000 sq.m.;
  • Khortor sub-station: a total area of 2,000 sq.m.

CONSTRUCTION COST
300 million Baht (12 million USD) (1 USD : 25 Baht)

SERVICE RENDERED
–  Architectural design;
–  Overall engineering design (structural, mechanical, electrical, and sanitary).
.
DURATION
August – October 1994