Projects - Construction Supervision of Solid Waste Transfert Station (New System)

Project Description

334708_NongKhaemW

LOCATION
Nong Khaem Soild Waste Disposal Center, NongKhaem district, Bangkok

OWNER
Solid Waste Disposal Division, Department of Environment, Bangkok Metropolitan Administration (BMA)

DESCRIPTION
The project is for construction supervision of a solid waste transfer station (new station) including compactor system and related equipment, wastewater treatment system and reused water system, road, drainage system, and other utility systems. The capacity of this station is a minimum of 2,000 tons per maximum 12 operating hours. The project located in a total area of 20 rais (3.2 hectares).

CONSTRUCTION COST
618.8 million Baht (13.5 million USD) (1 USD : 46 Baht)

SERVICE RENDERED
Construction supervision.
.
DURATION
September 2005 – March 2007