Projects - Construction Supervision of Road Network for Hongsa Mine Mouth Project (Lao PDR)

Project Description

335315_HongsaRoad

 

LOCATION
Muang Hongsa, Xayaboury province, Lao People’s Democratic Republic (Lao PDR)

OWNER
Hongsa Power Co., Ltd.

DESCRIPTION
The project is for construction supervision of 2-lane highway from Muang Ngeun to Muang Hongsa, Xayaboury province, Lao PDR with total distance of 36 kilometers, consisted of;
•  Asphaltic concrete main road with 3.5 meters width of each lane and 1.5 meters width of each shoulder. The total
distance is 31 kilometers;
•  Double bituminous surface treatment by-pass road with 3.5 meters width of each lane and 1.0 meter width of each
shoulder. The total distance is 5 kilometers.

CONSTRUCTION COST
704 million Baht (22.7 million USD) (1 USD : 31 Baht)

SERVICE RENDERED
Construction supervision.
.
DURATION
October 2010 – July 2012