Projects - Environmental Impact Assessment of Huai Kha Yung Reservoir, Sisaket Province

Project Description

LOCATION
Sisaket Province

OWNER
Royal Irrigation Department (RID)

DESCRIPTION
This project is an earth dam project a cross Huai Kha Yung stream. The capacity at designed storage level is 40 million cubic meters. The height of earth dike is 24.35 meters. The spillway building is located at the right side of the earth dike; and the maximum discharge is 186.40 cum/sec. Main canal are constructed on left and right side to transmit water by gravitational flow. The beneficial area is 20,000 Rai in the raining season and 12,000 Rai in dry season.

CONSTRUCTION COST

SERVICE RENDERED
1. Feasibility study of Engineering alternative option for project development and appropriate storage level.
2. Collect data and prepare a geographical information system and GIS Data dictionary.Environmental impact assessment

DURATION
May 5, 2017 – July 28, 2018